Chandelier Building

Chandelier Building, NW10

Renovation of tired & run down 5 storey 1960’s Office Block for landlord, to create Architect-Designed Modern; Funky Office & Workshop Units. Design by Barr Gazetas. 
  • Project value £1.2 Million.
  • ull Scaffold to External Elevations whilst maintaining full access to 3rd & 4th Floor Tenants & to Builder’s Merchants to rear of site sharing vehicle access.
  • Carry out overhaul & repair of existing Crittall Windows to all floors & elevations; external decorations inc. render bands and loading bay areas.
  • Install Metsec Frame Clad In Mesh to Central Front Elevation & Canopy to Access Staircase to match, with Floodlighting.
  • Demolish concrete stairs from 1st Floor entrance and create new ground floor entrance, installing Glazed Walling system to both Floors as infill; inc. Dorma operated Oak Entrance Door & panel with bespoke Door Entry system serving each unit.
  • Install new external High Level Signage to building perimeter.
  • Demolition & strip-out of internal walls & services to enable remodelling for each floor to create Separate Units on each floor & New WCs at both ends, inc. new drainage runs via ground Floor slab internally. 
  • Asbestos Removal & air Testing.
  • Create New Entrance Lobby with Bespoke Mesh Ceiling Runway with Chandeliers dropping via suspended mesh; new signage; Ambient Lighting & CCTV Installation, inc. Management Office; Security Room; DDA WC and Cleaner’s Cupboard.
  • Adaptions to existing Goods Lift to enable conversion to DDA-compliant Carriage. 
  • Subsequent Fit-out and refurbishment works for new tenants and additional upper floors as they are vacated.