Burbage Primary School
Burbage Primary School, N1
External Repairs & Timber Window Replacement to a Locally-listed Primary School over 4no. Floors:
- Project Value £1.0 Million
- Full scaffold to 8no. elevations providing continued access to all access points throughout the school.
- Replace all 207no. timber window of various sizes & shapes across the entire building to match existing fenetration, whilst enabling the school to continue a full timetable.
- Replace all sets of perimeter doors to match existing Patterns & fenestration, incorporating ironmongery and a secure door entry system inc. all power.
- Carry out repairs to brickwork across all elevations inc. Quoin cappings to roof playground perimeter. Pointing repairs as required.
- Decorations internally to all main corridors and main halls to each floor.